Cost control2 min read

What's free in ProtoPM, and what costs extra

Every core module in ProtoPM is free: unlimited projects, company members and project collaborators, with 2 GB of storage per company. Optional add-ons start at $5 CAD a month, are bought by the company, and are never priced per user.

ProtoPM pricing page showing the optional add-ons: Documents & Branding, storage packs, Firm Showcase and Supporter, each priced per company in Canadian dollars

What you get for $0

  • Every core module: schedule, field logs, punch list, financials and invoices, change log, risks, lessons learned, files and photos.
  • Unlimited projects, unlimited company members and unlimited project collaborators such as subcontractors, clients and architects.
  • One company you own, with 2 GB of file storage. Joining other companies or collaborating on their projects is unlimited.
  • No credit card to sign up, no trial clock and no expiry date.

Monthly allowances on Free

Three things are metered per company and reset every month: 10 PDF exports, 10 saved project versions and 3 branded invoice PDFs. Project, look-ahead and status report PDFs share the same 10 exports. If a company needs more of these, it doesn't have to leave Free to keep working: the allowance simply renews next month.

Optional add-ons (prices in CAD)

  • Storage +25 GB: $5 a month, stackable.
  • Storage +100 GB: $12 a month, stackable.
  • Documents & Branding: $9 a month for unlimited project PDFs and saved versions, branded invoice PDFs, and your logo and colours on outputs.
  • Firm Showcase: $6 a month for a public portfolio page for your company.
  • Extra company: $5 a month to own one more company. Your first company is free.
  • Supporter: $5 a month. Removes ads and adds a badge next to your company name.
  • Paying yearly costs ten months instead of twelve.

Bought by the company, not by each person

An add-on belongs to the company, so adding crew members never raises the price. Add-ons are bought directly from Settings → Billing and can be cancelled at any time. There is no add-on trial, because the free core is the trial.

What happens if you stop paying

Projects and records are always kept. A lapsed add-on makes only its feature read-only: PDF exports go back to the monthly allowance and a showcase page is unpublished but not deleted. If a company ends up over its storage allowance, it has a 60-day grace period with emails on days 0, 30 and 53 before the largest files are removed to fit. Existing files can still be viewed and downloaded during that time.

About ads

Ads help keep ProtoPM free. They appear on guides, templates and this blog, and any add-on removes them for the whole company. They never appear inside project screens or in anything a client sees. See the full price list.