Tracking inspections in ProtoPM

Reviewed October 2026

The Field tab's Inspections section records each inspection's type, permit number, scheduled date, inspector, notes and result: Scheduled, Passed, Failed or Re-inspect. Trade templates add the usual ones, such as rough-in and final for an electrical job.

It's free to run projects in ProtoPM.

What to record

  • Type, such as rough-in, framing, underground or final
  • Permit number and scheduled date
  • Inspector and notes
  • Result: Scheduled, Passed, Failed or Re-inspect
  • Photos and files attached to the inspection

Starter inspections by trade

  • Electrical: rough-in and final.
  • Plumbing: underground, rough-in and final.
  • HVAC: rough-in and final.
  • General contractor: framing and final.
  • Painting jobs hide inspections by default; a company can show or hide any section.

From a failed inspection to the punch list

Punch items can be linked to an inspection, so the fixes needed to pass a re-inspection stay next to the result.

Common questions

Does ProtoPM track building inspections?
Yes. Inspections are part of the Field tab, with permit number, date, inspector, result and notes.
Are inspections in the project export?
Yes. Inspections are a section of the full PDF or Excel export and of the client status report.